Read Original Story at: The Scrumble Project
Tom has finished the chain way hatch and has now joined me in preparing the forward end of the boat for undercoating with Penguard Highbuild. It is tedious and challenging work in temperatures above 35°C (95°F), with humidity over 80%, every day…
Read more at: The Scrumble Project
